| As a civil engineer at Prokon Civil and Structural Engineering Inc.: |
|
Client: |
Roketsan Roket Sanayii ve Ticaret A.Ž., Elmadaš – Ankara |
|
Services: |
Design, controlling and supervision |
|
Name |
Project description |
Cost (USD) |
Period |
| Phase 3 |
2 heating stations 710 t steel construction, |
1,900,000 |
Jul 1997 |
– |
Jun 1998 |
| Phase 4 |
Compressed air system 180 t steel construction, |
560,000 |
Feb 1998 |
– |
Nov 1998 |
| Phase 5 |
Industrial / manufacturing facilities 1,500 t steel
construction,
office building
860 t steel construction, |
1,840,000 |
Jul 1998 |
– |
May 1999 |
| Phase 6 |
Production halls 1,200 t steel construction and 36,000 m2
reinforced concrete, |
1,720,000 |
Aug 1998 |
– |
May 1999 |
|
As junior consultant at Project Implementation Unit: |
| Project: | Turkey Emergency Flood and Earthquake Recovery (TEFER) |
| Project cost: | USD 685M |
|
I. |
Municipal and rural infrastructure (USD 129M) |
|
♦ |
125 km state highways |
|
♦ |
Municipal services: 36 km municipal roads and 11 bridges |
|
♦ |
Rural services: 165 drinking water supply systems and 10 sewerage systems, 31 irrigation facilities and drainage systems, various aids to the agricultural and fishing industry, 1,245 km rural roads and 82 bridges, 40 km forest roads |
|
II. |
Flood management and hazard reduction (USD 254M) |
|
♦ |
Flood and landslide risk reduction and mitigation |
|
♦ |
Modernization of the monitoring, forecasting, and warning systems |
|
♦ |
Improvement of disaster response capabilities |
|
♦ |
Repair and improvement of flood protection infrastructure |
|
III. |
Earthquake reconstruction (USD 302M) |
|
♦ |
Demolition of damaged units |
|
♦ |
Housing reconstruction: 5,000 urban and 3,131 rural housing units |
| Project: | Marmara Emergency Earthquake Recovery (MEER/TERRA-1) |
| Project cost: | USD 1,795.75M |
|
I. |
Disaster response system and risk mitigation (USD 419.16M) |
|
♦ |
National emergency management system (USD 110.17M) |
|
♦ |
Disaster insurance scheme (USD 273.00M) |
|
♦ |
Land use planning and enforcement of construction codes (USD 11.78M) |
|
♦ |
Cadastre renovation and land management (USD 24.21M) |
|
II. |
Trauma program for adults (USD 6.89M) |
|
III. |
Construction of permanent housing: 14,066 housing units including infrastructural measures in and outside of construction sites as well as landscaping (USD 488.13M) |
|
IV. |
Business rehabilitation (USD 109.72M) |
|
V. |
Repair of existing housing stock, schools and healthcare facilities (USD 632.12M) |
|
VI. |
Rebuilding and repair of roads, water supply systems, wastewater systems, power and natural gas distribution networks (USD 139.73M) |
| Project: | Erzincan Earthquake Rehabilitation and Reconstruction Project (ERRP) |
| Amendments: |
♦ |
Senirkent reconstruction of infrastructure (USD 20M) |
|
♦ |
Sütēüler reconstruction and hospitals retrofitting design program (USD 7M) |
| Financing institutes: |
|
♦ |
World Bank and International Bank of Reconstruction and Development (IBRD) |
|
♦ |
European Investment Bank (EIB) with the Kreditanstalt für Wiederaufbau (KfW) |